GOLD COAST UNI HOSPITAL, Australia

When this new state-of-the-art medical facility needed a storage solution that met its stringent standards, Dexion came to the rescue
CONCORD HOSPITAL, Australia

A merger of two health facilities required a comprehensive new $1.5 million upgrade to the outdated storage solutions
PRIMARY HEALTHCARE, Australia

Discover how Dexion helped provide a new office document storage solution that was stylish, contemporary and blended seamlessly with the fitout
NATIONAL LIBRARY OF AUSTRALIA

With over nine million items in the collection, the National Library needed a storage solution that properly protects often-fragile material, while offering flexibility and scalability
NAB DOCKLANDS, Australia

“Fantastic and professional” was how the Senior Site Engineer described working with Dexion on NAB’s flagship new building
TRIPLE EIGHT RACE ENGINEERING, Australia

An innovative storage solution was paramount to maintain Triple Eight’s winning edge when the 2016 Supercar competitor expanded from 2 to 3 cars in 2016